Singapore's own portable BESS · mobile battery power

Industrial-grade portable BESS. Engineered in Singapore, built by one builder for another.

We are not importing somebody else's by-product and putting a Singapore sticker on it. The EH-Series battery energy storage system was designed here, and every revision of it came out of a real review from a real site: the operator who said the handle was in the wrong place, the foreman who needed a different socket, the safety officer who wanted the panel moved. From 5 kWh to 500 kWh, built by people who have stood on the site it is going to.

Under 50 dB(A) Zero emissions on site IP54 rated Same day deployment

We reply the same working day. Tell us the load and the dates, and we will tell you what it takes.

EH-Series portable battery energy storage system deployed on a Singapore construction site
0
Battery energy storage systems deployed across Singapore
As of 2026
0
Clean energy supplied through our BESS fleet
And climbing every month
0
Cost savings achievable against diesel generator sets
Up to, on hybrid deployments
0
Deployable capacity, from 5 kWh portable battery units upwards
Battery generators to containerised BESS

Anyone can import a battery. We engineered one for Singapore.

Why we exist

Diesel is running out of road. Most "portable power" was never built for this.

Night works next to housing. Fit-outs inside a live building. Fuel that has to be stored, guarded and topped up at 2am. Tenders that now ask about emissions before they ask about price. The generator that solved all of this for forty years is quietly becoming the thing that loses you the job.

The usual alternative is a battery in a box, shipped in from overseas, with a manual written for another country and a support desk eight hours behind you. When it trips on a Saturday, nobody local can tell you why.

That gap is the reason this company exists.

Portable BESS units powering site equipment directly at the work face
Decentralised site power

Instead of pulling wires, we bring the power next to you.

On most sites the real cost is not the generator. It is the cabling. Long runs from a single supply point, trip hazards through walkways, cable that has to be laid, protected and moved again next week, and an electrician booked before anyone can start.

A portable BESS removes that problem by putting the power source at the work face. The unit goes where the tools are: down in the basement, up on the deck, inside the tunnel, beside the gondola. No trenching, no temporary distribution board, no waiting on an infrastructure upgrade.

Our own platform

The EH-Series. Ours by design, not by purchase order.

Most portable BESS in this region is bought from a factory overseas and resold with a new sticker. The EH-Series is different. We designed it, we localised it for Singapore conditions, and in April 2026 we filed a patent application covering the innovation behind it.

A reseller has to email a factory and hope. We just do it.

  • Patent pending. Application filed April 2026
  • Localised. Engineered and documented for Singapore industrial sites
  • Configurable. Output, capacity and form factor to suit the deployment
  • Supported here. Spares, service and engineering response in Singapore
The EH-Series range of portable battery energy storage systems, from EH-Mini to EH-Cube
One partner, the full range

Mobile battery energy storage from 5 kWh to 500 kWh, from the same team.

You should not have to change supplier because the project got bigger.

5 to 8 kWh
Portable battery generators for tools, lighting and small sites
20 to 30 kWh
Stacked and cabinet BESS for industrial loads and backup power
Up to 500 kWh
Containerised battery energy storage for site-wide power and peak demand
Hybrid
Battery working alongside grid, generator or solar
The difference

There is no second version of what we do.

We do not need to name competitors. The comparison speaks for itself.

An importer or resellerEnergy Revolution Engineering
The productBought from an overseas factory, rebadgedThe EH-Series, our own design, patent pending
ComplianceDocumentation written for another marketBuilt and documented for Singapore sites
ModificationsEmail the factory. Wait. Usually no.We hold the drawings. Usually yes.
SizingSells you what is in the containerSized from your actual load and runtime
CablingOne supply point, long runs, more cablePower delivered at the work face
RangeOne or two models5 kWh to 500 kWh, plus partner products
When it faultsA support ticket in another time zoneThe engineer who commissioned it
BackingWhatever the local entity can carrySystems integrator arm of GoRental Global
Strategic appointment, effective 1 September 2025

Engineering depth meets regional deployment scale.

Energy Revolution Engineering has been appointed as GoRental Global's systems integrator for the commercial and industrial sector.

ERE leads the technical front, translating complex site loads, operating conditions and project constraints into integrated battery energy storage solutions. GoRental Global drives market expansion and large-scale deployment across Singapore and Southeast Asia.

Energy Revolution Engineering and GoRental Global systems integration partnership in Singapore

Trusted by Singapore's contractors and project partners

GoRental Global, partner or client of Energy Revolution Engineering Green Tenaga, partner or client of Energy Revolution Engineering Samwoh, partner or client of Energy Revolution Engineering Land Transport Authority, partner or client of Energy Revolution Engineering China Harbour Engineering Company, partner or client of Energy Revolution Engineering Koh Brothers, partner or client of Energy Revolution Engineering Kajima Overseas Asia, partner or client of Energy Revolution Engineering Shimizu Corporation, partner or client of Energy Revolution Engineering Gim Tian Civil Engineering, partner or client of Energy Revolution Engineering SMRT Corporation, partner or client of Energy Revolution Engineering PUB, partner or client of Energy Revolution Engineering National Environment Agency, partner or client of Energy Revolution Engineering Building and Construction Authority, partner or client of Energy Revolution Engineering Singapore Green Building Services, partner or client of Energy Revolution Engineering Singapore Institute of Aerospace Engineers, partner or client of Energy Revolution Engineering True Colour Media, partner or client of Energy Revolution Engineering Hiap Heng Group, partner or client of Energy Revolution Engineering Megastone Holdings, partner or client of Energy Revolution Engineering GoRental Global, partner or client of Energy Revolution Engineering Green Tenaga, partner or client of Energy Revolution Engineering Samwoh, partner or client of Energy Revolution Engineering Land Transport Authority, partner or client of Energy Revolution Engineering China Harbour Engineering Company, partner or client of Energy Revolution Engineering Koh Brothers, partner or client of Energy Revolution Engineering Kajima Overseas Asia, partner or client of Energy Revolution Engineering Shimizu Corporation, partner or client of Energy Revolution Engineering Gim Tian Civil Engineering, partner or client of Energy Revolution Engineering SMRT Corporation, partner or client of Energy Revolution Engineering PUB, partner or client of Energy Revolution Engineering National Environment Agency, partner or client of Energy Revolution Engineering Building and Construction Authority, partner or client of Energy Revolution Engineering Singapore Green Building Services, partner or client of Energy Revolution Engineering Singapore Institute of Aerospace Engineers, partner or client of Energy Revolution Engineering True Colour Media, partner or client of Energy Revolution Engineering Megastone Holdings, partner or client of Energy Revolution Engineering
In the media

Featured in The Business Times.

The Business Times feature on portable battery energy storage systems in Singapore construction, 18 June 2026
"Created in collaboration with Energy Revolution Engineering, the EH-ONE+ was made to comply with Singapore's safety and regulatory standards."

The Business Times, 18 June 2026. The feature reports that switching from generator sets to the EH-ONE+ can lead to cost savings of 40 to 50 per cent while maintaining uninterrupted power supply on site, and that these battery energy storage systems have prevented 1.5 million kilograms of carbon emissions to date.

Read the full article →
Make the switch

You do not have to believe any of this. Put one unit on one site.

Nobody changes their site power strategy because of a website. So we are not asking you to. We are asking for one load, on one site, for one month. Keep the generator. Keep the programme. Change nothing else.

Step 01

Pick your worst load

The container office. The night works. The hand tools three floors up. Whichever one has a generator idling at 30 per cent just to keep it alive.

Step 02

We size it and deliver

Our engineers profile the load, specify the battery energy storage system, deliver it and commission it on site. Your operators are trained before we leave.

Step 03

Read the numbers yourself

Generator runtime, litres burned, refuelling trips, noise complaints. If the numbers do not move, you have lost a month and nothing else.

Nothing to rip out

Hybrid means the generator stays. The battery simply takes the loads it should never have been running.

Rent it first

Trial deployment before any commitment, structured through GoRental Global. Buy later if it earns its place.

Same working day reply

Send the equipment list. You will have a real sizing answer back from an engineer, not a brochure.

Deployment as quick as same day

Fleet units are charged and ready. When the dates are tight, that is often the difference.

Every contractor on this page started with one unit on one site.

Tell us the load. We will tell you the system.

What needs powering, for how long, and when. That is enough for us to come back with a real answer. Our fleet is finite and the good dates go early, so if your project has a fixed start, talk to us before it is urgent.

WhatsApp Email